Executed where downtime is not an option.

From LNG expansion packages inside Ras Laffan Industrial City to potable water networks, rail depots and district infrastructure — a record built on scope discipline and safe delivery.

01Ongoing
RLIC NFE EPC3 — site works and route plan
RLIC NFE EPC3 — site works and route plan
Ongoing

RLIC — NFE EPC3 (Multidiscipline Package)

Client
Qatar Energy LNG
Main contractor
Tecnicas Reunidas / GSO
  • Electrical works — 13 km
  • Instrumentation works
  • Telecommunication works
  • Cathodic protection works
  • Civil works
RLIC NFE EPC3 — civil works and aerial map
RLIC NFE EPC3 — civil works and aerial map
Ongoing

RLIC — NFE EPC3 (Civil Package)

Client
Iris Construction
Main contractor
Tecnicas Reunidas
  • Civil works
Baladna facility — ammonia plant exterior
Baladna facility — ammonia plant exterior
Ongoing

Baladna Ammonia Refrigeration System

Client
Baladna
  • Preventive maintenance of motors, fans, pumps and rotating equipment
  • Checking ammonia leak points using approved testing methods
  • Inspection of pipe insulation, vapour barrier and aluminium cladding
  • Routine inspection of the ammonia compressor
  • Inspection of the ammonia piping system for leakage, corrosion, vibration and damage

Also in progress

  • American School Academy — maintenance and fit-out
  • Supply and installation of QNCC compound water supply pipe
  • Potable water supply pipe for 48 Nos. Qatar Energy compound, Al Dafna
  • Supply and installation of stainless steel pipes for Plant 3 & Plant 4, Baladna
  • Street light and feeder villa connection, testing & commissioning — North Lusail Infrastructure, Early Works Package Phase 1
  • Supply and installation of potable water supply pipe for 50-villa compound (Royal Garden), New Salata
02Completed

Mesaieed — Ras Abu Fontas

HBK Contracting Co.

  • 15 kilometre pipeline
  • Excavation for pipeline

Mesaieed — Distillate Main GTC 45 / Upgrade

HBK Contracting Co.

  • 10 kilometre pipeline
  • Excavation for pipeline

Package 4 — Qetaifan Island North

CCC–TCC

  • 11 km, 12 km and 600 m pipe length
  • Fluid handling — potable water
  • 6 and 12 months contract duration

Package 8 — Qetaifan Island North

Al Jaber Electro-Mechanical

  • 4.5 kilometre pipe length
  • Pipe wrapping
  • 6 months contract duration

Green Line Project — Qatar Rail, Bani Hajer

Dorex Engineering

  • 240 m of 1600 mm diameter pipe
  • Civil works
  • 4 months contract duration

Red Line Project — Lusail Waterworks

CCC–TCC

  • 300 m of 1200 mm diameter pipe
  • Fluid handling — potable water
  • 14 months contract duration

Upgrade E-Ring North/South, Muntazah Road

Daewoo

  • 1.2 kilometre pipe length
  • Fluid handling — water and firefighting (copper pipe)
  • 14 months contract duration

CP02E Foxhills North/South

Qatar Gas

  • Civil works
  • 15 months contract duration

Access Road — Awamer Integrated Accommodations Community

Marbu Contracting Co.

  • 300 metre pipe length
  • Fluid handling — potable water (dry leg)
  • 3 months contract duration

RIW in Greater South Zone 90–95, P604 Phase 5

Contraco

  • Fluid handling — potable water
  • 36 months contract duration

CP 361/3A North Sewer Rising Main

  • 1600 mm diameter pipe testing
  • Trench works and pipe jointing